Quote:
Originally Posted by W///
Slim to no chance it'll cost under $5k for CCB. Don't see why it wouldn't cost the same as M5/6, which is $9250.
|
My rationale is that all carbon costs are gradually coming down, plus the 3's brakes will be marginally smaller than the 5's because of the lower weight.